top of page

WE'RE HIRING!


Email joe@eco-constructors.com for more info

 

Sustainable, Low-Impact Solutions

ECO Constructors is the green choice leader and premier provider in erosion control, specialty seeding and storm water compliance needs. Established in 2002, we have the expertise and equipment to perform a variety of erosion control services, such as stream bank restoration, living walls, living channels and swales as well as erosion and sediment control for construction sites. We also provide full service EPA and DNR inspections and SWPPP documents.

ECO Constructors is the local manufacturer of Filtrexx Soxx. We can make pallets of Soxx with various lengths and sizes. Our personnel are the most skilled, safety conscious and qualified in the industry. We provide project estimates based on the size and quantity of your erosion control needs. We are able to tailor proposals, equipment and manpower to meet your specifications. Our main goal is to provide the highest quality products and services to our customers.

OUR SERVICES

BLOWN-IN

MULCHING

ECO Constructors can install a variety of specialty mulches with our blower trucks. We can re-mulch existing beds or install new mulch to any landscape and hard to reach areas.

Eco Constructors advantage:

  • Quicker Installations

  • Precise and distributed evenly

  • Easy access to hard to reach places

  • Reduces Waste

HYDROSEEDING & TERRASEEDING

Whether you need to seed in winter or hold a difficult slope, Terraseeding can handle the job. Terraseeding is a "blown-in" application that mixes compost with seed to create an ideal growing environment.

Eco Constructors advantage:

  • Immediate erosion control on slopes

  • Dormant seeding capability

  • Increased germination rates

  • Seeding is natural and 100% biodegradable

EROSION CONTROL

Our products are used as silt fence alternatives, straw bale replacements or as a substitute for other BMP's commonly used on construction sites.

Eco Constructors advantage:

  • Lower Maintenance

  • Faster Installs

  • Lower Project Costs

SWPPP

INSPECTIONS

ECO Constructors keeps development sites in compliance with not only the EPA's regulations but local regulations as well by using a project management plan that includes:

  • SWPPP CreationSecure on-site storage of SWPPP and other necessary documents.

  • Initial SWPPP updating and continued updating throughout the life of the project.

  • EPA required on-site inspections every 7 days and 24 hours after any rainfall greater than 1/2 inch*

  • Maintenance and installation when needed

Picture1.jpg
SITE-Proud-Member.png
IECA.png
MOA-Logo.png
MORA-logo (1).png
COAM Logo.webp
bottom of page